You are here:
Publication details
Model zatápania ložiska Rožná
Title in English | Flooding of Rožná mine |
---|---|
Authors | |
Year of publication | 2017 |
Type | Conference abstract |
MU Faculty or unit | |
Citation | |
Description | Uranium mine Rožná is planned to be liquidated by controlled flooding. One of the main problems connected with flooding is a question how the process of flooding the mine will progress. The flooding of uranium mine was simulated using the program PMWIN 5.3.3. and the time necessary for flooding the mine up to the level of dewatering adit was computed to approximately 30 years. The result is inaccurate, because of uncertainty of specific storage parameter. |